MOSINTER Group participated in ICIF China in Shanghai from September 15 to 17, 2026. The E4D66 booth panels included industrial machinery and equipment alongside chemical materials. A project discussion after the show should begin with process data rather than an assumed model or capacity.
Define the duty before selecting equipment
For a mixer or other process machine, provide the material and its bulk properties, batch size or throughput, moisture and temperature conditions, cleaning requirements, available utilities and the required contact material. Identify the intended operating sequence and acceptance criteria for a trial or factory test.
For the current product starting point, review the industrial ribbon blender page. Confirm grade-specific details with the relevant team before selection.
Scope the quotation
Review the relevant equipment page, then state the project location, installation constraints, required documentation and any existing machine being replaced. Configuration and performance must be confirmed for the proposed equipment and the actual material.
Send material, capacity, process and destination details through the MOS Machinery inquiry page for a project-specific review. Send an inquiry.